The Characteristics and Scope of Application of Horizontal Directional Drilling Rig -- Yikuang Science and Technology


Release time:

2021-03-17

Author:

Source:

1. features 1. The construction process is simple, operable and easy to organize and implement. Through site investigation, design the crossing line, connect the drill bit and pipeline, and the drilling rig is in place, then construction can begin. 2. It does not pollute the environment, does not affect traffic, has little damage to the ground, and can meet the requirements of high environmental protection for urban underground pipe network construction. 3, low cost, significant social and economic benefits, can reduce the administrative examination and approval of excavation, convenient construction organization, low comprehensive cost. 4, good safety, due to the use of pipe construction, construction personnel operations are carried out on the ground, to avoid the impact of deep foundation pit operations and other adverse construction conditions, improve the safety system.

1. features

1, the construction process is simple, strong operability, easy to organize and implement; through the site survey, design the crossing line, connect the drill bit and pipeline, drill in place, can start construction.

2. It does not pollute the environment, does not affect traffic, has little damage to the ground, and can meet the requirements of high environmental protection for urban underground pipe network construction.

3, low cost, significant social and economic benefits, can reduce the administrative examination and approval of excavation, convenient construction organization, low comprehensive cost.

水平定向钻机,施工工艺流程,很受用

 

 

4, good safety, due to the use of pull pipe construction, construction personnel operation are carried out on the ground, to avoid the impact of deep foundation pit operations and other adverse construction conditions, improve the safety factor.

5, the pipeline connection quality is good, because the pipeline connection is carried out on the ground, a single section of pipeline connection qualified after a pull pipe laying, improve the quality of pipeline connection.

6, the construction period is short, compared with the traditional "digging groove buried pipe method", greatly shorten the construction period, no need to transport and pile up soil, only a small amount of mud.

水平定向钻机,施工工艺流程,很受用

 

 

2. scope of application

1. This method is applicable to municipal water supply and drainage construction.

2. This method is a trenchless pipe laying technology, which is suitable for pipeline laying through rivers, lakes, buildings and other obstacles, as well as the construction of urban municipal underground pipe network that is not suitable for excavation.

3. It is suitable for various formations without boulders, including water-bearing formations, not suitable for gravel layers, and generally used for soft soil layers.

4. Applicable pipes are steel pipes and PE pipes, with a pipe diameter of 200-1200mm and a maximum pipeline length of 1500m.

5. Due to the limitation of the detection depth of the detector, the maximum guided drilling depth is 15m.

水平定向钻机,施工工艺流程,很受用

 

 

3. safety and civilized construction assurance measures

1. Before the construction starts, the full-time safety officer must conduct a comprehensive investigation and detailed understanding of the surrounding environment, underground pipelines and geological conditions in the construction area. The position, direction and depth of underground pipelines, air defense facilities and canals in the crossing area must be well known. Relevant technical measures shall be taken in the construction organization design to ensure the construction safety. Special personnel shall be instructed to properly handle the underground pipelines and air defense facilities in the drilling work area.

2, before the start of construction, to the construction personnel carefully carry out safety technical measures disclosure, in the whole construction process effectively implement the safety technical measures in the construction organization design, at the same time must establish a safety technical disclosure system, must prevent the kind of only talk about form, not for the actual effect of the practice.

3. Before the start of the crossing project, the directional drill shall be tested, the equipment shall be debugged and operated, the positioning system shall be adjusted, and any abnormal phenomena shall be timely studied and dealt with, and the construction shall be started only after it is confirmed to be safe and reliable.

水平定向钻机,施工工艺流程,很受用

 

 

4. Construction personnel must wear safety helmets and protective gloves when going up and down the drill pipe. Attention should be paid to safety to prevent accidents.

5. During the crossing process, the driller shall pay attention to the index of the pressure gauge, and immediately stop the machine for inspection if any abnormality is found, especially if the pressure rises suddenly, the construction can be continued only after the inspection and troubleshooting.

6. During the crossing process, the directional hand shall always pay attention to the crossing direction and depth of the drill pipe. In case of deviation, correct the deviation in time to ensure that the drill pipe is drilled along the designed crossing curve. In case of drilling sticking, immediately withdraw from the drilling area, stop drilling for inspection, find out the solution and ensure safety before construction.

水平定向钻机,施工工艺流程,很受用

 

 

7. During mechanical excavation, the construction personnel shall stand in the safe area. Manual excavation, the use of work should be firm, operators should keep a safe distance. Before excavation, slope sloping or slope support shall be done according to the excavation depth and geological conditions. Construction materials and construction equipment should not be placed at the edge of the pit, otherwise measures must be taken to strengthen the slope of the pit. In the rainy season construction should pay attention to the drainage around the foundation pit.

8. Before towing the pipe, the project manager shall check whether the hoisting equipment and auxiliary facilities are safe and reliable. The towing process shall be directed by a special person. It is strictly prohibited to control anyone below.

 
Collection

This article is reproduced from the drill set network, infringement will be deleted.

Key words:

Technology, Construction, Undertaking, Crossing, Safety, Pipeline, Must, Excavation, Underground, Depth