Dust detector
1. induction conditions
(1) Dust measuring workers must be qualified through professional technical training and take up their posts with valid certificates.
(2) Master the "Coal Mine Safety Regulations" and the methods, processes and precautions of the province and company for mine dust measurement.
(3) Understand the allowable concentration, over-limit hazards and prevention knowledge of various toxic and harmful gases in the mine.
(4) to understand the coal mine prevention of gas, coal dust explosion and fire and other mine disaster knowledge, and familiar with the mineWell disaster avoidance route.
2. preparation
(1) Carefully check the dust measuring instrument to ensure that the appearance is clean, the accessories are complete, and the electric keys or knobs are sensitive and reliable.
(2) When using the dust detector for the first time, the working state and related parameters should be set first.
(3) The dust detector should be fully charged on the ground first, and then used after checking that it is normal; when the voltage is less than 5.5V,The instrument should be charged.
3. operation method
1. Working principle
After the filter membrane clamp is put into the dust meter, the detection system in the dust meter initializes the measurement of the blank filter membrane,and store the measured values. After 5S, the dust detector starts sampling, and the negative pressure formed by the operation of the air pump draws the dust-containing air into the air.To the filter membrane, so that the filter membrane accumulates dust, and the sampling synchronization of the meter to start timing, the detection system according to the filter.The amount of dust on the film automatically sets the sampling time. When the dust detector stops sampling, the data is processed by the microcontroller.The dust concentration is calculated and displayed on the display.
2. Precautions
(1) The sampling location shall be on the return air side.
(2) The sampling height is in the human breathing belt, generally about 1.5m.
(3) When sampling at the tunneling face, it shall be on the side of the roadway where the air duct is not installed, away from the coal (rock) and driving.Eye or shotcrete and other locations 4~5m.
(4) When sampling in the coal mining face, it should be in the return air side of the shearer, 10~15m away from the shearer.All right.
(5) When working in multiple processes at the same time in the coal mining face, the return air lane shall be 10~15m away from the return air outlet of the working face.199 carried out.
(6) When sampling at the transfer point, it should be carried out at the return air side 3m away from the transfer point.
(7) When sampling in other dust producing places, the sampling location shall be as good as possible without hindering the operation of workers.The volume is close to the breathing belt of the worker's work.
(8) When measuring dust, the sampling port of the instrument must face the wind current.
(9) Requirements for the start time of dust measurement: For continuous dust production operations, they shall be in the normal state of production.Sampling after 5min of state; for intermittent production operations, sampling should be carried out while workers are working.
3. Operation of CCZ-1000 type direct reading dust meter
The dust detector shall be fully charged and the charging time shall be 14~16h. Before sampling, install the impact sampling head toOn the sampling head interface of the instrument (when collecting respiratory dust, the impact plate should be coated with silicone grease before sampling,Then install the impact plate into the sampling head; no impact plate is installed in the sampling head when collecting all dust), press the push rod, and at the same timeInsert the filter membrane clip mounted with the filter membrane from the filter membrane socket of the dust detector, and the filter membrane clip is in place (note: it is strictly prohibited to notAdd a good filter membrane to start sampling). Turn on the power switch of the dust detector, enter the prompt interface, select andSet the interface.
(1) Time setting.
Press the "repeat" key on the interface to make the "time setting" status flash; Press the "confirm" key, the cursorMove to "year", set the year through ""-"key, press" select "key, and move the cursor to" month ",Do the same as above until the time is set, press "OK" to exit.
(2) setting of dust properties.
Press the "select" key, move the cursor to the "dust property" entry, press the "confirm" key;Select "key, select the dust species to be selected, the selected dust species will appear on the display screen, and then press" confirm"Recognition key; Enter the "Full Dust/Call Dust" option, and then press the "Select" key to select "Full Dust" or "Call Dust",Press the OK key to exit.
(3) setting of dust coefficient.When the dust measurement error is too large or too small, the "dust coefficient" can be set ". Press the "Select" key to set the cursorMove to the "Dust Factor" entry, where "Dust Factor" and "100" flash alternately; press "" or "-"Key, modify the dust coefficient (dust coefficient can be adjusted within 60~300); When the coefficient is set, press"Acknowledge key to exit.
(4) Setting of sampling address.
Press the "select" key, move the cursor to the "sampling address" entry, press the "confirm" key;On "coal face 01", set the address number as required (for example, set the sampling address as "coal face 3",Move the cursor to "Coal Face 01", press the "Confirm" key first, then press the "Select" key to select "Coal Face 01"3 ", and finally press the" confirm "key to exit). Similarly, press the "select" key to select "tunneling 01" and "spray"Pulp I "" reprint I "" other I "" ground working face "etc.
(5) Timing sampling.
Press the "select" key to move the cursor to "timing sampling"; press the "confirm" key, the dust detector will enterTiming test status, the longest sampling time is 5min; Press the "Start/Stop" key to sample. Timing testFor dust concentration less than 2 mg/m3The correctness of the time is worse than that of automatic sampling.
(6) Data query.
Press the "query" key to enter the query state of the dust detector, and the last 50 can be accessed through the "" or "-" key.Test records; press the "select" key to exit. Press "" is the first of 50 test records, press"-" is the last test record.
(7) Automatic sampling.
When the dust detector sets the date, time, dust nature, dust coefficient and sampling address, press "start/Stop "key can be automatically sampled. After sampling, the screen displays the sampling results, sampling time, dust concentrationDegree. The maximum sampling time is 30min.
(8) Data deletion.
When the test results can delete unnecessary data in the data query, you can press the "confirm" key first,Press the "-" key again, the currently displayed data may be deleted.
4. Treatment of oil removal by filter membrane
When there is oil mist in the air at the sampling site, the filter membrane should be degreased first. The specific steps are as follows:
(1) Place the steam bottle containing No. 120 solution gasoline in a crucible with a thermometer with a measuring range of 200 ℃ inserted.In the crucible, the condensing device is connected and the electric furnace is connected to the power supply, so that the oil temperature is kept at about 110 ℃, the maximum is not more.At 120°C, the distilled gasoline was collected in a clean jar.
(2) Number 3 weighing bottles and pour distilled 120 solvent gasoline.
(3) Fold the filter membrane with oil mist collected with forceps and vascular forceps for 3 times, and then fold it with vascular forcepsClamp the filter membrane edge in the first weighing bottle and shake for 2min, then put it into the measuring bottle and shake for 2min.
(4) Put the oil-removed filter membrane on a clean glass plate, and open the filter membrane with tweezers to volatilize the oil,Weighing after 30min.
(5) put the filter membrane that has been removed once into the third weighing bottle according to the above method and remove the oil once again, howeverAfter that, open it and place it for 30min, volatilize the gasoline on the filter membrane and weigh it until the weight is constant.
5. Record
(1) The dust measurement records shall be filled into the ledger in time.
(2) After the dust measurement is completed, the dust measurement result report form shall be filled in, and the dust concentration measurement for this month shall be completed at the end of the month.Make a report form and report it in a timely manner.
4. considerations
(1) The dust detector should be placed in a leather box after carrying and using, and pay attention to keeping it clean and avoiding violent collisions,Rinse the used impact plate.
(2) When the dust detector is turned on for the first time, it should be turned on and preheated for 200s; Before starting up and preheating,A blank filter shall be inserted into the detection device.
(3) When the dust detector is stopped from use or storage, the filter membrane clamp should be taken out of the detection device and stored separately to avoidCollision deformation in the dust measurement affects the use.(4) If the dust detector fails during use, it should be returned to the ground for maintenance by professionals.
(5) The dust detector should be properly kept after use. If it is not used for 2 consecutive months, it should be charged once.
(6) The battery used by the dust detector shall comply with the provisions of GB3836.4, with over-current protection and over-chargingProtection and over-discharge protection function, and through the spark test of the detection department, it is strictly forbidden to disassemble or replace at will.
(7) The charger matched with the dust detector is a non-explosion-proof product and is strictly prohibited from being used under the mine.
(8) the dust meter should be stored in the air circulation, no corrosive gas, no dripping water and liquid invasion, air phaseFor the warehouse with humidity not more than 90% and temperature of 0~40 ℃.