What are the precautions before and during the construction of the hand-held pneumatic drilling rig?
Release time:
2019-01-14
Author:
Source:
1. preparation work 1. Before installing the drilling rig, the downhole air valve shall be opened to blow the viscera of the pipeline clean. The air pipe has the function of removing air and water. The pipe joint shall be cleaned. The oil mist device shall be filled with oil. The air pipe shall be connected properly. When water is supplied, the water pipe shall be connected to keep the water pipe joint clean. 2. The "three tightness" should be achieved in front of the eyes, I .e. tight cuffs, tight neckline and tight clothing corners. First, don't: don't wear gloves. In the 2. drilling construction, the drill pipe shall be installed with the drill bit and then into the drill sleeve. Then, the two hands hold the handle to stabilize the drill, align the drill bit with the drilling position, hold the air intake wrench by hand, and the air intake valve is opened (closed after loosening). The drill pipe starts to rotate. At this time two
Key words:
Construction, drilling rig, drill pipe, drilling, wrench, tight mouth, clean, don't, rotate, force
Previous Page
Previous Page:
Next page: