Coal Loading-Manual Coal Loading
1. artificial coal loading
Most of the coal mine production has been mechanized, artificial coal loading is rare, but for small coal mines or edge.Angle coal mine mechanization degree is still very low. Is a higher degree of mechanization of the face, in order to improve the recovery rate,Recycling valuable coal resources sometimes requires manual coal loading.
(I) General Provisions
(1) Coal workers can only do coal in places where the support is complete and safe. If the coal is taken out from the goaf,Long handle tools must be used, and it is forbidden to put the head and hands into the goaf. In the coal, if there is roof cavingIn case of danger, immediately evacuate from the danger area and report to the shift and team leader at the same time.
(2) If a misfire is found, the squad leader and blasters must be found to deal with it. They are not allowed to dig the misfire themselves. In the coal pileFound explosives, detonators, picked out must be handed over to the squad leader, blaster, not allowed to throw into the scraper conveyor, miningEmpty area or private possession.
(3) Operation sequence: preparation → treatment → coal → coordination with support workers, etc. to do a good job in engineering specification quality → sweepingClear floating coal.
(II) preparation, inspection and handling
Prepare shovel, sledgehammer, pickaxe, rake and other tools before taking up the post, and check the firmness of each tool.
The following items shall be checked and handled well before coal shoving:
(1) After blasting, brake the top of the top beam, "knock on the top and ask for the top", and hit the temporary pillar at the broken part of the top plate,Work under the reliable protection of temporary support.
(2) When the coal wall has umbrella eaves or is in danger of flake, it must be handled in time.
(3) The unqualified support around the coal shoving site must be repaired and completed.
(4) The scraper conveyor within the scope of operation must be stable and reliable, and the signal device must be flexible and reliable.
(5) Remove the obstacles from the coal gang to the top line within the operation range. The materials should be put in order and the floating coal should be cleaned.sweep, in order to ensure the work of their own safety and ventilation, pedestrian patency.
(6) The upper and lower coal retaining plates shall be set up before coal is transferred in the inclined working face.
(III) Operation and Precautions
1. Operation
(1) Grasp the spade, first push the coal into the chute from the edge of the coal pile from top to bottom, and then push the coal into the chute along the bottom.Internal coal.
(2) The coal removal shall be coordinated from top to bottom, and no random lifting shall be allowed.
(3) When shoving coal, it is necessary to clean the bottom, pay attention to whether the pillar is hit on the real bottom, and hit the floating coal first.replace the column; when digging the column nest near the side of the coal wall, it is necessary to prevent the sheet from hurting people.
(4) When the coal is lying in the extremely thin coal seam, the sidewalk coal shall be scraped first, and then the help coal shall be scraped.
(5) Coal larger than 0.4m shall be smashed, and crushed coal shall be loaded first and then lump coal shall be loaded to avoid rolling injury of lump coal.People.
2. Precautions
When loading coal to the scraper conveyor, the following matters should be noted:
(1) Do not break cables, lighting lines, signal lines, etc.
(2) No coal loading during shutdown.
(3) When the scraper conveyor is overloaded and cannot be started, the coal in the chute shall be pulled out and forced to start.
(4) No coal loading is allowed when the scraper conveyor is full of trough, floating chain and chain deviation.
The following regulations shall be observed when loading coal from the slip tank:
(1) The gate must be opened in sections or a coal baffle must be set up. The person watching the gate must work under the protection of the protective plate.
(2) No coal loading is allowed when the chute is full. The coal in the chute shall not be emptied to prevent coal splashing from hurting people.60
(3) When repairing the chute (enamel chute), contact the top well, stop the coal and gangue or set it tightly.Baffle.
(4) It is forbidden to load coal across the conveyor trough.
(5) When the nozzle of the conveyor is stuck by coal, it is forbidden to directly move the coal by hand, and a long handle such as a shovel should be used.Tools, from top to bottom.
(6) When the coal slide gate is stuck, you can stand on one side of the eye and poke from bottom to top, but you are not allowed to move your body.Probing into the eye, you are not allowed to hold the spade handle and poke it at the top, so as not to cause the coal to hit the spade and hurt people.
The following regulations shall be observed when the machine is chasing the floating coal in the mining face:
(1) Coal shall be removed within the maximum length of hanging beam and temporary roof specified in the operation regulations.
(2) Pay attention to the swing of traction rope and anchor chain at any time to avoid hurting people. It is not allowed to ride over traction rope and anchor chain.Coal.
(3) Pay attention to the roof and coal gang at any time. When the roof is found to be in danger of cracks and ballast, umbrella eaves and gang, etc,It must be dealt with in a timely manner.
In order to ensure the quality of coal, coal gangue should be implemented. ① Gangue shall be picked out before coal removal and thrown into goaf;
② When large pieces of gangue are smashed, pay attention to whether there are cracks or looseness when moving the gangue to prevent falling and hurting people when moving;
③ If the gangue cannot be thrown into the goaf, separate transportation of gangue and coal shall be implemented.
(IV) Final Work
(1) After completing the assigned tasks, check the quality of the project specifications with the support workers, etc.That is, processing. No umbrella eaves shall be left, top coal and bottom coal shall not be lost, and floating coal shall be cleaned up. reserved as specifiedCannon track or machine track.
(2) After being checked and confirmed by the shift, team leader and acceptance team, the tools can be collected and the work can be stopped.