Use of shotcrete machine
Release time:
2023-01-04
Author:
Source:
Use of shotcrete machine
Use of shotcrete machine
(I) hidden danger investigation
After arriving at the work place, first check the intact condition of the support, cover all kinds of facilities, and conduct a comprehensive and careful inspection.Check it again and confirm that it is safe before operation.
(II) material preparation
(1) Prepare the materials required for shotcrete.
(2) mixing requirements: cement, sand mixing evenly, need to add accelerator, according to the requirements of the proportion of put,and timely use.
Test run of (III) shotcrete machine
After the test run of the shotcrete machine is normal, after checking that there is no one in the spraying area, open the dust-proof facilities;After the rock surface is washed with dust and sprinkled with water, spray slurry is started.
(IV) shotcrete operation
(1) shotcrete operation procedure requirements: first open the air, then water supply, adjust the air pressure and water distribution, and finallyPower feeding. When stopping, stop the material first. After the storage in the material waiting cylinder is sprayed, the power is cut off, and finally the water and air are cut off.
(2) Start-up sequence: water supply → open air pressure → open shotcrete → adjust air pressure and water pressure → feed → shotcrete;
Shutdown sequence: stop feeding → stop shotcrete → turn off water → turn off air, turn the power switch to zero position and lock it.
(3) nozzle operation: first boiling water, then open air, timely adjust the water cement ratio, nozzle and spray surface to keep vertical,And keep a distance of about 1m from the spray surface, and the spray sequence shall be wall first and arch later.
(4) Spray gun trajectory control requirements: when spraying the wall, it moves from bottom to top in a horizontal broken line; SprayWhen shooting the arch, it moves in a spiral trajectory from bottom to top, with a trajectory diameter of 200~300mm, and is pressed in one circle.Construction of a ring jet sequence.
(5) In the initial spraying, the back wall shall be arched first, from top to bottom, and in the re-spraying, the ground shall be started, the wall shall be arched later, andIt's up and down, and finally capped.
(6) When spraying in roadways with a height greater than 3m, a workbench shall be set up to keep the spray gun mouth 1m away from the spraying surface.Left and right.
(V) cleaning and sanitation
After the spraying work is finished, remove the conveying pipe from the shotcrete machine, remove the nozzle, clean the water ring; disassemble the sprayThe feed part of the slurry machine and the conveying system, clean up the mortar or material inside and outside, and set up the air pipe,Collect rebound.
Curing of (VI) concrete surface
After the spray work is completed, the spray layer must be continuously sprinkled for maintenance for more than 7 days, and the sprinkling water per day shall not be less than one day.Times.
(VII) maintenance and common fault handling
1. Routine maintenance
(1) After each completion of the spraying machine, it is necessary to stop the machine for maintenance and maintenance to ensure the operation of the spraying rotating boom.Normal; When the spray stop time exceeds 10min each time, the spray gun and slurry pipe shall be cleaned in time, and the instructions shall be strictly followed.Demolition, cleaning, installation and commissioning of the use of spray gun, to maintain excellent spray performance.
(2) Regularly clean up the dust on the main chassis, ventilation hood holes, power supply and other devices to maintain good heat dissipation.The device works normally; keep the photoelectric grid glass clean to ensure accurate and reliable photoelectric detection.
(3) Regularly clean the dust exhaust blades and air duct to keep the dust unblocked; Clean the spray room once a month; TimelyRemove the paint on the conveyor belt and adjust the tightness of the conveyor belt.
(4) Replace the CVT lubricating oil every six months, and lubricate the bearings in each shift.
2. Common fault handling
In the use of shotcrete machine, the nozzle is often blocked, the rotor is blocked, the discharge elbow is blocked, the blasting pipe is blocked, etc.
Reason: the aggregate particle size is too large, the water content of dry mixture is too large, the conveying air pressure is too low, the air inletThe pipe section is too small, and the air supply volume of the compressor is small.
Treatment: if the aggregate particle size is too large, should stop the machine rotation, close the gas valve, from the elbowRemove the conveying pipe, open the gas valve, and blow out the storage of the rotor; then check the conveying pipe and use woodHit the plug with the rod, loosen or hollow out the plug; if the water content of the dry mixture is too large, stop the machine.Turn the machine to close the air valve; If the discharge elbow is blocked, the pipeline should be disassembled and the elbow and rotor material should be cleaned.Cavity, etc., to reduce the water-cement ratio of mixed materials; if the conveying air pressure is too low, the motor and air supply pipeline should be stopped;If the rotor is blocked, disassemble the air inlet pipe and the upper air pipe; clean the rotor material cavity with a brush. If it is pressure fanIf the air supply is small, the large section air duct should be replaced and the large capacity air compressor should be replaced.
Key words: